JC Petro

Liner Hanger With Packer Introduction

Liner Hanger With Packer

We are a Liner Hanger With Packer manufacturer. Different packer liner hanger size and grade materials can be supplied.If you have Liner Hanger With Packer inquiry or tender,welcome contact us.

When oilfiled cementing in waiting to be solidified, the high-pressure oil, gas and water invade the cement slurry that has not been fully solidified to form a channel of flow.After the cementing, the sealing quality of the overlapping section is poor. No cement at all causes the formation of oil, gas and water to penetrate into the casing or the fluid in the well to invade the formation.

Running the liner hanger with packer is an effective measure to ensure the sealing quality of overlapping sections.

After the packer is set, an isolation layer can be formed between the outer casing and the tail pipe. It can prevent the migration of oil, gas and water.

Liner Hanger With Packer Structure

Operating Principle

Features:   

Liner Hanger Packer Main Parameter

SpecificationABC
Seat pressure, t30– 5030– 5030– 50
Rated load, t160120160
Load carrying capacity of load support sleeve, t161616
Sealing capacity, MPa252525
Hydraulic cylinder shear nail shear pressure, MPa7–87–87–8
Shearing pressure of ball shear pin, MPa16-1716-1716-17
Shear nail shear pressure of tail pipe rubber plug, MPa121212
Casing steel gradeN80 Pll0N80 Pll0N80 Pll0
Casing wall thickness (mm)10. 03, 11. 05, 11. 9910. 03, 11. 05, 11. 9910. 03, 11. 05, 11. 99
Casing nominal weight (m / kg)59. 52, 64. 73, 69. 9459. 52, 64. 73, 69. 9459. 52, 64. 73, 69. 94
Maximum outer diameter of the body (mm)215
Inner body diameter (mm)155
Total length of drill rod rubber plug (mm)332
Copper ball diameter (mm) S Φ45/42
Length of return barrel (mm)2800
Simple diameter of back connection (mm) Φ187
Lifting short section upper joint Thread type 410 (NC50)
Overflow area casing wall thickness (mm) Before/after mounting, cm2
Overflow area 10.0365/35
Overflow area 11.0557/31
Overflow area 11.9951/28

Liner Hanger Packer Project Case

The Exsisted Problem

The failure of the liner hanger rubber Cylinder caused the well completion failure.

The New solution

Use a packer liner hanger to connect the sieve tube, then connect it to the cementing well

The Test

In the test, the centralizer was welded to the packer body so that the outer diameter was greater than 218mm.

Weld two rectangular centralizers to the outer surface of the isolation sleeve. So that the thickness on one side is greater than the thickness on the other side (3mm thick, then 9mm).

The diameter of the two centering blocks is 222.5mm.

The inner diameter of the housing is 244.4 inches.

After sealing set, pressure up to 25Mpa and observe the seal.

Conclusion

From the above test process and test data, this test is successful. It meets the requirements of sealing and sealing in an eccentric state.The sealing pressure of 25 Mpa can meet the requirements of customers’ horizontal well cementing.

Well condition

If you have any inquiries of liner hangers, Contact us freely.

Tel & WhatsApp: +86 158 0546 5460 Email: sale@greenenergyoilfieldservices.com